Modern Farmhouse

We developed a waterfront property in Scituate, MA into a modern, sustainable farmhouse. Jen acted as the overall developer coordinating with the town zoning board and contractor (Trevlex Construction). She collaborated on the home design with Tiryaki Architects and on several of the interior design elements with Emily Anderson of Minton Interiors. 

  • 3,500 sf house with an acre of waterfront property that has doubled in value

  • Total development time of nine months with three months for permitting and six months for construction.

  • Sustainable features throughout, with costs 25% lower than the average square foot price at that time and on-going utility bills 50% lower than the average.

Photo Credits: Danielle Robertson Photography